HKCHL
Data center equipment with status indicator lights

Projetos que construíram
nossareputação

Every delivery teaches us something about logistics, documentation, and client expectations. These cases represent the breadth of what we handle.

110 servidores xFusion

xFusion 2288H V6 rack server cluster for data center expansion in Moscow region. Sourced from xFusion distribution, configured with custom memory and NVMe storage, pre-shipment tested in Shenzhen. Full customs clearance documentation, sea freight via Vladivostok with DDP delivery to client dock.

110 unidades · xFusion 2288H V6 · entrega em 6 semanas

Atualização de armazenamento empresarial

HPE Alletra 6000 all-flash array deployment for financial services client in Dubai. Phased migration from legacy 3PAR with zero-downtime cutover. Included HPE InfoSight setup, replication configuration, and knowledge transfer to local IT team.

24 unidades · HPE Alletra · entrega em 4 semanas

Cluster de treinamento de IA

8-GPU Dell PowerEdge XE9680 nodes with NVIDIA H100 80GB SXM5 for ML research institute in Brazil. End-to-end logistics including export licensing for GPUs, on-site commissioning support, and NVIDIA AI Enterprise licensing.

16 unidades · Dell XE9680 · entrega em 5 semanas

Renovação de data center

Full hardware refresh for mid-size colocation facility in Poland. Mixed fleet of Dell R760 and HPE DL380 Gen11, with trade-in of previous-gen equipment. Coordinated just-in-time delivery to minimize colo downtime.

85 unidades · OEM misto · implantação em 8 semanas

Infraestrutura bancária

Huawei FusionServer 2288H V7 cluster with OceanStor Dorado storage for regional bank in Indonesia. Complete high-availability architecture with dual-path networking. Local Huawei partner coordination for warranty transfer.

45 unidades · Huawei · entrega em 6 semanas

Implantação de borda para telecom

Lenovo ThinkSystem SE350 edge servers for telecom tower deployments across East Africa. Ruggedized configurations for harsh environments, remote management setup via XClarity, solar power integration consulting.

120 unidades · Lenovo SE350 · entrega em 10 semanas